Our Projects
Explore our portfolio of innovative steel fabrication solutions and success stories
Project Categories
Discover our expertise across different areas of steel fabrication
Structural Steel
Commercial and industrial building frameworks
Industrial Equipment
Custom machinery and equipment fabrication
Architectural Elements
Decorative and functional steel installations
Infrastructure
Bridges, walkways, and public structures
Featured Projects
Showcasing our most innovative and impactful work

Nairobi County Water Storage Project
Design and construction of high-capacity steel water storage tanks across multiple districts in Nairobi County
Project Value
KES 5M
Timeline
4 months
Storage Capacity
2.5M liters
Case Studies
Detailed insights into our most challenging and successful projects
Client Success Stories
Hear from our satisfied clients about their experience working with us
"Starzed Engineering exceeded our expectations with their attention to detail and professional approach. The teams expertise in steel fabrication was evident throughout the project."
John Doe
Project Manager
ABC Developers Ltd
Project Results:
- Completed 2 weeks ahead of schedule
- 15% under budget
- Zero safety incidents
"Their innovative solutions and quality workmanship have made them our go-to partner for all steel fabrication needs. Highly recommended!"
Jane Smith
Operations Director
XYZ Industries
Project Results:
- Increased production capacity by 40%
- Minimal operational disruption
- ISO compliance maintained
Project Gallery
Before and after transformations of our projects
Industrial Steel Water Tank Installation
Design and installation of 2.5M liter capacity steel water tank for Nairobi County
Before
After
Project Details:
- Capacity: 2.5 million liters
- Height: 15 meters
- Diameter: 18 meters
- Installation duration: 45 days
Steel Structure Manufacturing Facility
Construction of steel framework and roofing for manufacturing plant in Industrial Area
Before
After
Project Details:
- Total area: 2,500 square meters
- Steel used: 180 tons
- Height: 12 meters
- Construction period: 4 months
Project Timelines
Explore how we execute projects with precision and efficiency
Commercial Complex Steel Structure
Client
ABC Developers Ltd
Duration
8 months
Budget
KES 85M
Planning & Design
6 weeks
- Structural analysis and design
- Material specification
- Construction drawings preparation
- Client approval and revisions
Fabrication
4 months
- Material procurement
- Component fabrication
- Quality control checks
- Assembly preparation
Installation
2 months
- Site preparation
- Component transportation
- On-site assembly
- Structural connections
Completion
3 weeks
- Final inspections
- Quality assurance
- Client handover
- Documentation